Skip to content
All articles

Orphan Wells

Colorado plugged 161 wells this fiscal year and warned about the bill

4 MIN READ

Shawn Azdam

Founder

Snowy Front Range peaks with emerald well markers and monitoring arcs.
On this page

Two days ago, staff briefed Colorado's Energy and Carbon Management Commission on the orphan-well program's fiscal 2026: 161 wells plugged, 548 sites methane-monitored, staffing up on federal IIJA and BLM grants — and a candid warning about long-term spending needs. Annual reports usually bury the bill. Colorado put it on the agenda. Both halves of that briefing deserve attention.

161 plugs and what they cost to produce

Colorado's 161 fiscal-year plugs reflect a program operating at genuine scale: crews in the field year-round, inspection staff verifying completions, administrators converting grants into bid packages on cadence. The staffing increases tied to federal grants show the mechanism working — IIJA and BLM dollars converting into permanent capacity rather than one-off contracts. Programs that spend grants on staff as well as plugs build the machine that outlasts any single award.

The monitoring number may matter more. Methane-monitoring 548 sites means Colorado is watching more than three times as many locations as it plugged — building the ranked, evidence-backed backlog that prioritizes next year's plugs by measured risk rather than proximity proxies. Monitoring is the discovery-and-triage spend that makes plugging spend efficient. Programs that plug without monitoring work blind; Colorado is buying itself sight.

The warning is the maturity signal

Now the part most programs would have soft-pedaled: staff warned commissioners that clearing the backlog will require sustained long-term spending beyond current grant horizons. This is not an admission of failure. It is the opposite — a program with good enough books to price its own future, telling its governors the truth before the money runs short rather than after.

Contrast the alternatives. Programs that project confidence without cost curves hit funding cliffs mid-backlog and stall visibly, eroding the credibility that wins the next appropriation. Programs that price honestly give legislatures time to plan: fee adjustments, bonding reforms, phased appropriations. Colorado's warning is a budget request wearing an annual report's clothes, and sophisticated commissioners will treat it as the opening of a multi-year funding conversation rather than a problem statement.

How the math should work

The honest arithmetic runs: total backlogged wells, minus wells fundable under current grants, at current per-well costs, over the years the grants cover — equals the gap the state must fill from its own sources. Every term in that equation is estimable, and Colorado's program clearly estimated them. The policy levers for closing the gap are the familiar set: raise or restructure production fees, tighten bonding so fewer wells orphan going forward, sequence federal phases for maximum drawdown, and prioritize by risk so the highest-harm wells clear first.

Other states should replicate the briefing format, not just the numbers: plugs completed, sites monitored, staff built, gap priced, options presented. A commission that sees this dashboard annually can govern the program; a commission that sees only plug counts can only applaud it. Governance beats applause when the grants sunset.

What this means for contractors

Colorado's trajectory reads as steady-state demand with upside risk — in the good sense. Current grant funding supports the existing tempo; the long-term warning signals the state is planning the funding to sustain or grow it. Contractors with Colorado crews should treat the program as durable pipeline and invest accordingly: the combination of honest cost accounting and active monitoring is the profile of a buyer that keeps buying.

The monitoring program is itself an opportunity. Methane monitoring at 548 sites and growing needs instruments, flights, analysts, and protocols — a services market adjacent to plugging that rewards different capabilities. Firms that can both monitor and plug, or partner across the boundary, will find Colorado's integrated approach congenial.

What we think at Terrabillion

Price the backlog. That is the whole lesson of Colorado's briefing: know what clearing your wells costs, tell your governors before they have to ask, and let honest numbers drive sustained funding. Too many programs treat cost projections as pessimism and plug counts as the only story. Colorado told both stories at once — 161 plugs and the bill for the rest — and modeled what program maturity looks like. Every other state commission should demand the same briefing. The backlog is a number. Say it out loud, and fund it.

Orphan-well intel, monthly

Contact sales